Skip to content

Pillar V

Technology Geopolitics & AI

Semiconductors, export controls, the AI race and asymmetric biological and synthetic technology security risks.

Events · 30d
11
High importance
2
Reports · 30d
2
Regions
5

Tech & AI · event map· 4 items · 2 high importance

Pillar feed

Events

View all
22/09MediumAsia-PacificTaiwan's August export orders reach a record 102.96 billion dollars, up 71.4% year on year21/09MediumAsia-PacificGround is broken on the 89-hectare Baipu chip park in Kaohsiung: 4,000 jobs and NT$300 billion a year17/09MediumEuropeEU Commission proposes a social media ban for under-13s and guardian-supervised accounts for 13- to 14-year-olds17/09HighMiddle East and North AfricaUnited States notifies Congress of a 48-aircraft F-35 sale to Saudi Arabia worth 24.3 billion dollars17/09MediumSouth AsiaSEMICON India 2026 opened: more than 600 exhibitors and a target of 50,000 wafers a month at Dholera17/09MediumAsia-PacificTaiwan is expanding Longtan Science Park by 104 hectares: NT$95.63 billion investment and 4,500 new jobs11/09MediumAsia-PacificSouth Korea's 1–10 September exports hit a record 34.97 billion dollars, up 82.6% on a chip boom10/09MediumAsia-PacificTSMC's August revenue hits a record 514.81 billion NT dollars, up 53.3% year on year on artificial intelligence demand08/09HighAmericasUS intelligence agencies accuse six Chinese AI companies of distilling American models on an industrial scale03/09MediumAsia-PacificChina's CXMT begins production of HBM3E high-bandwidth memory as its global DRAM share reaches 10%

Decision modules

From the latest report: Building a fab versus owning the chain: India's capacity, Taiwan's depth, Japan's demand data · 18 September 2026

Open in report

Probabilities

Scenarios

ScenarioProbabilityTriggerMarket impact
H1Packaging runs ahead, the advanced node lags55%In India, nine ATMP/OSAT projects and plants such as CG Semi enlarge capacity; the Dholera and Longtan timetables do not change.A second address outside East Asia forms at mature nodes and in packaging and test, while advanced node supply stays concentrated in Taiwan.
H2The timetable slips, incentives grow30%The end-2028 permit target at Longtan is missed, or payments under the 1.275 trillion rupee Semicon 2.0 programme are delayed.The entry into service of announced capacity is pushed to the middle of the 2030s and the gap between commitment and cash widens.
H3Demand momentum breaks15%The growth in chip and chip equipment shipments continues the slide from 23.2% in July to 19.3% in August over the following months.The assumed return on capacity investment weakens and new commitments and expansion approvals slow.

Module A

Constraints Matrix

STRUCTURAL AVG 3.8 · TACTICAL AVG 2.5Structural constraints dominate: the outcome is set more by these limits than by the actors' preferences.

Hard structural constraintspersistent · beyond the actors' will

  • Geographic concentration of advanced node capacity · Taiwan

    4/5

    Construction of the 104-hectare expansion at Longtan begins in 2030; beyond the existing 106.94-hectare cluster and its 7,000 jobs there is no near-term advanced node alternative.

  • No announced production timetable at Dholera · India

    4/5

    Investment of more than 910 billion rupees has been announced for a 50,000-wafer-a-month line, but the sources carry no official information on when the first wafer will come out.

  • Dependence on imported materials and equipment · India

    4/5

    Despite EDA access for 105 companies, 68,000 chip design engineers and a 20% share of the global design workforce, advanced materials and equipment supply remains imported.

  • The energy bill is eating the export gain · Japan

    3/5

    In August crude oil import volume rose 3.6% while value rose 58.7%; the trade deficit widened to 1.106 trillion yen for a fourth consecutive month.

Tactical frictiontemporary · eases over time

  • Permit and environmental assessment timetable months

    3/5

    In the Longtan expansion, development permits and the environmental impact assessment must be completed by the end of 2028; the plan is still awaiting Executive Yuan approval.

  • Speed at which commitments turn into cash months

    3/5

    No payment timetable has been published for the 1.64 trillion rupee cumulative commitment across twelve projects or for the 1.275 trillion rupee Semicon 2.0 budget; delay pushes back plant openings.

  • Slowdown in export momentum weeks

    2/5

    Japan's export growth eased from 23.2% in July to 19.3% in August; a pace above expectations but below the previous month.

  • Water, power and labour burden months

    2/5

    Adding 4,500 people to the existing 7,000 jobs at Longtan increases pressure on infrastructure; yet infrastructure construction does not begin until 2030.

Module B

Signal vs Noise

SIGNAL 67% · NOISE 33%

  • SIGNAL

    The packaging and test end of the chain in India is now actually running

    CG Semi at Sanand has entered commercial production with an initial capacity of 200 million units a year against a target of 5 billion; CDIL's assembly, test and packaging plant at Mohali has opened.

    Business Today — SEMICON India 2026

  • SIGNAL

    The gap between design strength and manufacturing has not closed

    20% of the global chip design workforce is in India and 68,000 engineers have gone directly into design; against that, advanced materials and equipment supply remains dependent on imports.

    ORF — Beyond the Fab

  • SIGNAL

    Chip demand continued to carry exports in August

    Japan's August exports rose 19.3% year on year; shipments to the United States rose 24.9% and to China 20.6%, with chip-related shipments supporting the increase.

    Business Recorder (Reuters) — Japan August trade

  • SIGNAL

    The import bill is inflated by price, not volume

    In August crude oil import volume rose 3.6% while value rose 58.7%; total imports recorded their sharpest increase since November 2022 at 28%.

    Data: Brent crude oilNikkei Asia — Japan's 4th straight monthly trade deficit

  • NOISE

    The expectation that the Longtan expansion will add chip supply in the near term

    In the 95.63 billion NT dollar project, permits are to be completed by the end of 2028 and infrastructure construction begins in 2030; the 550 billion NT dollar output target belongs to the period after that timetable.

    Taipei Times — NDC approves Longtan expansion

  • NOISE

    The perception that a TSMC advanced node fab at Longtan is settled

    In May 2026 local media reported that the company was seeking government approval for the post-expansion site; the investment decision could not be independently verified.

    Focus Taiwan (CNA) — Longtan expansion approved

Module C

Asset-Class and Positioning Implications

Asset classExposureTransmission channelH1H2H3ExpectedConvictionHorizonWhat to watch
EquitiesSemiconductor capital equipment and advanced packagingThe gap between capacity announcements and the actual order and installation timetable+−−0.05●●3–12 monthsThe first wafer announcement from the Dholera line and the equipment installation timetable
Freight & insuranceElectronics shipments out of East AsiaHow chip and chip equipment shipment volumes feed into foreign trade data+0+0.40●●0–3 monthsThe annual change in chip items in Japan's September trade data
CommoditiesCrude oil and energy inputsThe import bill swelling from price rather than from volume000.15●●0–3 monthsThe monthly Brent average and the annual change in the value of crude oil imports
FXLira cost of electronics importsPass-through of the energy and intermediate goods bill to the current account00.85●●3–12 monthsThe USDTRY path and the unit value of electronics intermediate goods imports
VolatilityPrice volatility from the Asian supply chainAdvanced node capacity continuing to concentrate in a single geography0+++0.45●●3–12 monthsOfficial revision of the Longtan permit timetable and the Executive Yuan decision

How to read: ++ strong structural support · + support · 0 neutral · − pressure · −− strong pressure. “Expected” is the direction weighted by scenario probabilities. H1: Packaging runs ahead, the advanced node lags · H2: The timetable slips, incentives grow · H3: Demand momentum breaks.

General, scenario-conditional analysis at asset-class level. It contains no specific security, price target or trade timing and is not personalised investment advice (Turkish Capital Markets Law No. 6362).

Last 30 days

Regional distribution

Most cited

Actors

Non-Western sources

Multipolar View